Sale!

ISO 9001:2015 Quality Management System Document Pack

Original price was: $570.00.Current price is: $399.00.

This is not a generic office-based template relabelled for construction. Every procedure, form, checklist and register is written around how small contracting teams actually work: multiple live sites, subcontractors, tendering and contract review, method statements and permits, quality hold points, and formal client handover — not desk-based service delivery.
Quantity:

For Small Engineering, Construction & Field Services Contractors

A complete, ready-to-use ISO 9001:2015 Quality Management System document pack, built specifically for small engineering, construction and field services contractors — civil and structural contractors, MEP (mechanical, electrical, plumbing) contractors, welding and steel fabrication contractors, telecom mast, fibre and solar installation contractors, oilfield and energy field service companies, facility maintenance and shutdown contractors, and geotechnical and survey firms.

This is not a generic office-based template relabelled for construction. Every procedure, form, checklist and register is written around how small contracting teams actually work: multiple live sites, subcontractors, tendering and contract review, method statements and permits, quality hold points, and formal client handover — not desk-based service delivery.

Built for Small Companies

Most ISO document packs on the market are written for large, office-based organisations with dedicated QHSE departments. This pack is sized and written for small contractors — typically 5 to 20 employees — where the same one or two people manage quality, tendering, site delivery and client relationships. The documents are practical and lean: no bloated corporate procedures that a small team has no capacity to maintain, and no documentation that assumes a head office full of administrative support.

Records and site-level forms are designed to be completed by site personnel working outdoors, often with limited time and no desk — short forms, tick-box checklists and clear layouts rather than dense paragraphs of text.

Built for This Industry

Every document in this pack reflects the reality of engineering, construction and field services work: tendering and bid submission, mobilisation and site induction, method statements and inspection & test plans, permit-to-work-style hold points, subcontractor prequalification and on-site management, materials traceability, and commissioning and handover to the client. The structure follows the full project lifecycle — from tender through to close-out — rather than a generic manufacturing or office-services template.

What’s Included

The pack contains 118 fully editable templates covering every ISO 9001:2015 clause, organised into 18 logical process areas (folders) that mirror how a contracting business actually operates — from tendering, through site execution, to internal audit and management review.

Document type Quantity
QMS Manual 1
Quality Policy 1
Procedures (SOPs) 32
Forms 36
Checklists 9
Registers & Logs 39
Total editable templates 118

 

 

 

 

 

 

Every single template is paired with a completed worked example in PDF, showing exactly how a finished, filled-in version should look. This means 236 files in total: one editable Word or Excel template plus one completed example for every document in the pack.

Formats: editable Microsoft Word (.docx) for manuals, policies, procedures and forms; editable Microsoft Excel (.xlsx) for registers, logs and trackers; completed examples supplied as PDF.

Full Document List

Below is the complete list of documents included in the pack, organised by process area (folder), so you can see exactly what you are getting before you buy.

00 — QMS Framework
  • QMS Manual
  • Quality Policy
  • QMS Scope Statement
  • QMS Process Register
  • Policy Sign-off Log
01 — Context & Planning
  • Context Analysis Register
  • Interested Parties & Requirements Register
02 — Leadership & Organisation
  • Job Description
  • Leadership & Management Commitment
  • Organisational Chart
  • RACI Matrix
03 — Risk, Change & Objectives
  • Quality Risk Assessment
  • Change Request Approval Form
  • Risk & Opportunity Management Procedure
  • Change Management Procedure
  • Risk & Opportunity Register
  • Quality Objectives & KPI Register
  • QMS Change Log
04 — Resources, Plant & Equipment
  • Equipment/Plant Pre-Use Inspection Checklist
  • Plant, Equipment & Infrastructure Register
  • Monitoring, Measurement & Calibration Register
05 — Knowledge Management
  • Knowledge Management Procedure
  • Knowledge Base / Method Library Register
  • Lessons Learned Register
06A — Competence & Training
  • Site Induction Checklist
  • Training Needs Analysis Form
  • Competence / Trade Skills Assessment Form
  • Performance Appraisal Form
  • Competence Management Procedure
  • Competency & Trade Certification Matrix
  • Annual Training Plan
  • Staff & Site Personnel Training Record
06B — Awareness & Communication
  • Toolbox Talk Record
  • Site Progress Meeting Minutes
  • QMS Awareness Programme
  • Internal & External Communication Plan
  • QMS Awareness / Toolbox Talk Log
07 — Document & Record Control
  • Document Control Procedure
  • Records Management Procedure
  • QMS Document Register / Master List
  • Records Retention Schedule
08A — Client Communication & Complaints
  • Client Communication Procedure
  • Customer Complaint Handling Procedure
  • Client Communication Log
  • Complaint Log
08B — Tendering & Contract Review
  • Tender & Contract Review Checklist
  • Client Project Requirements Capture / Scope Definition Form
  • Bid / Tender Submission Template
  • Tender & Contract Review Procedure
  • Tender Register
08C — Scope & Variation Management
  • Scope Variation / Change Request Form
  • Variation Order Log
09A — Design Management & Planning
  • Design & Development Plan
  • Design & Development Input Specification
  • Design & Development Management Procedure
09B — Survey & Site Investigation
  • Survey / Site Investigation Report Review Checklist
  • Survey & Site Investigation Procedure
09C — Design Review, Independent Check & Output Sign-off
  • Design & Development Review Record
  • Independent Design Check / Calculation Verification
  • Design & Development Output Review Sign-off
09D — Drawing Control & Design Change
  • Drawing & Design Document Issue Register
  • Design Change Control Log
10 — Subcontractor & Supplier Management
  • Subcontractor On-Site Performance & Compliance Checklist
  • Subcontractor Quality Prequalification Questionnaire
  • Supplier / Materials Evaluation Form
  • Subcontractor Engagement Agreement
  • Subcontractor Work Order / Scope Brief
  • Subcontractor & Supplier Management Procedure
  • Approved Subcontractor & Supplier Register
11A — Delivery & Project Control
  • Site Mobilisation & Establishment Checklist
  • Daily/Weekly Site Quality Walk-through Checklist
  • Method Statement
  • Inspection & Test Plan (ITP)
  • Progress / Client Reporting Form
  • Operational Planning & Control Procedure
  • Construction & Installation Execution Procedure
  • Project & Site Management Procedure
  • Project / Site Tracker
  • Site Diary / Daily Activity Log
11B — Output Identification & Traceability
  • Work Output Identification, Marking & Traceability Procedure
  • Materials Test Certificate & Traceability Register
11C — Operational Change
  • Operational Site Change Request Form
  • Site Operational Change Log
12A — Client & Third-Party Property
  • Client & Third-Party Property / Drawing Control Procedure
  • Client-Provided Drawings, Materials & Equipment Register
12B — Preservation
  • Materials Storage & Preservation Checklist
  • Preservation of Materials, Equipment & Completed Works Procedure
12C — Handover & Close-out
  • Practical Completion / Handover Certificate
  • Post-Project Review / Lessons Learned Form
  • Commissioning, Handover & Close-out Procedure
13A — Quality Hold Points & Release
  • Quality Hold Point / Stage Release Checklist
  • Work Stage Release / Quality Hold Point Approval Procedure
  • Stage Work Release Record
13B — Nonconformance Management
  • Nonconformance Report (NCR) Form
  • Nonconformance Management Procedure
  • NCR Log
14A — QMS Performance Monitoring
  • Performance Monitoring & Measurement Procedure
  • QMS KPI Dashboard / Performance Report
14B — Client Satisfaction
  • Client Satisfaction Survey Form
  • Client Satisfaction Measurement Procedure
  • Client Feedback Register
14C — Data Analysis
  • Data Analysis & Evaluation Report
15 — Internal Audit
  • Internal Audit Plan
  • Internal Audit Report
  • Audit Finding / Observation Form
  • Internal Audit Procedure
  • Annual Internal Audit Programme
  • Audit Register
16 — Management Review
  • Management Review Meeting Agenda
  • Management Review Minutes
  • Management Review Presentation
  • Management Review Procedure
  • Management Review Action Plan
17 — Corrective Action & Improvement
  • Corrective Action Request (CAR) Form
  • Corrective Action Procedure
  • Continual Improvement Procedure
  • CAR Register / Tracker
  • Improvement Ideas & Actions Register
Frequently Asked Questions
Is this pack tailored to my specific company?

No — this is a generic commercial template pack for the engineering, construction and field services sector. It is professionally structured and industry-specific, but you will need to insert your own company name, logo, roles and site-specific detail into each document before use.

Will this get me certified to ISO 9001:2015 as it is?

The pack gives you a complete, audit-ready structure covering every ISO 9001:2015 clause. To achieve certification you will still need to complete the documents with your own operational detail, implement the system in practice, and pass a certification audit by an accredited body. This pack removes the burden of writing everything from scratch.

What file formats will I receive?

Manuals, policies, procedures and forms are supplied as editable Microsoft Word (.docx) files. Registers, logs and trackers are supplied as editable Microsoft Excel (.xlsx) files. A completed PDF example is included for every single template so you can see how a finished version should look.

Is this suitable for my specific trade — e.g. welding, telecoms, solar, or oilfield services?

Yes. The pack is built around the shared processes common across civil, structural, MEP, welding/fabrication, telecom mast and fibre, solar, oilfield and energy field service, facility maintenance, and geotechnical/survey contractors — tendering, mobilisation, method statements, subcontractor management, and handover. Trade-specific detail (e.g. your own method statements and technical specifications) is added by you.

Which ISO 9001 version does this cover?

The pack is built to the current ISO 9001:2015 standard and its clause structure.

Do I need a consultant to implement this?

Many small contractors implement this pack themselves, using it as a ready-made starting point. If you want hands-on implementation support, gap analysis, or internal audit services, that is available separately as a consulting engagement.

What is the usage licence?

This pack is licensed for single-user use only — one company, one implementation. It may not be resold, redistributed, shared with other businesses, or used to service multiple unrelated client organisations without a separate multi-use or reseller licence. Contact us if you need a licence covering multiple companies or consultancy resale.

What support is included after purchase?

Every purchase includes email guidance and minor edits for the first 30 days after purchase — for example, clarifying how to complete a specific form, or making small formatting or wording adjustments to a document. This does not cover full bespoke customisation, on-site implementation, or ongoing consultancy, which can be arranged separately if required.

Can I add or remove documents to fit my company’s size?

Yes. The pack is modular — each of the 18 folders can be used in full or trimmed back to match your company’s size and risk profile. The document list above shows exactly what is in each folder so you can plan this before you buy.

Cart (0 items)

Create your account